Helium Recovery Facility
This project focused on the development of a helium recovery
ARJAE supported the development of a 15,000 bbl/day crude fractionation facility designed to separate crude feed into multiple refined product streams. The project brought together process engineering, equipment design, and fabrication expertise to deliver a reliable processing system supported by integrated plant utilities and infrastructure.
Through close coordination between engineering and fabrication teams, ARJAE delivered a facility designed for efficient operation, reliable product separation, and long-term performance.




This project involved the design and fabrication support for a crude fractionation facility capable of processing 15,000 barrels of crude feed per day. The facility was engineered to separate crude feed into multiple refined product streams while integrating essential plant utilities and infrastructure.
ARJAE’s role focused on developing an efficiently integrated processing unit, ensuring that the fractionation system and supporting plant services worked together to support stable operations and dependable performance.
Capacity
15,000 bbl/day crude feed processing
Product Streams
Naphtha
Kerosene
Diesel
Residue
Supporting Systems
Fired heater
Fuel gas treatment
Closed drain system
Plant utilities
Infrastructure
Main plant piperack
The facility was developed using an engineering-first methodology, allowing process design, equipment layout, and constructability considerations to be addressed early in the project lifecycle.
Fractionation equipment and plant utilities were developed in parallel to support efficient separation, stable plant operation, and long-term maintainability. This coordinated approach helped ensure smooth integration between process equipment, piping systems, and facility infrastructure.

Fabrication and assembly activities were completed within ARJAE’s indoor fabrication facility, providing a controlled environment for structural steel fabrication, piping systems, and modular components.
Close collaboration between engineering and fabrication teams supported the efficient construction of the plant piperack and supporting systems, ensuring seamless integration with plant utilities and processing equipment.
The project required careful coordination between multiple product streams, complex piping systems, and supporting utilities. Key challenges included integrating the fractionation equipment with plant infrastructure while maintaining efficient layout and constructability.
These challenges were addressed through:
Detailed process and layout planning
Modular fabrication strategies
Early coordination between engineering and fabrication teams
This approach streamlined fabrication, simplified installation, and ensured effective integration between the fractionation equipment and plant support systems.
This project highlights ARJAE’s ability to engineer and fabricate integrated crude processing facilities. Through coordinated engineering, fabrication, and facility integration, the project delivered a reliable fractionation system supported by robust plant utilities and infrastructure.
Whether it’s specialized equipment, modular processing systems, or full facility development, ARJAE delivers integrated engineering and fabrication solutions tailored to complex oil and gas processing needs.

This project focused on the development of a helium recovery

The project included capture of CO2 from ethanol production purifying